PORTS AND LOGISTICS

/5-4.jpg
PORT INSTALLATIONS FOR THE NEW FERTILIZER PLANT IN RAS AL-KHAIMAH.
UNITED ARAB EMIRATES
Preliminary project of a pilot dock for solid bulk and wharf for liquid bulk with an access bridge of 2 km and study of the equipment required (conveyor belts, cranes, conveyor transfer station and loading arms). Operational analysis of port installations, design bases, study of maritime weather and channel dredging.
2013
PROJECTS BY BUSINESS UNITS
PORTS AND LOGISTICS
PORTS AND COASTS

INTECSA-INARSA, S.A.

C/ Julián Camarillo 42

28037 | Madrid | Spain

P +34 915 673 800

F +34 915 673 805

general@intecsa-inarsa.es

Imagen sellos calidad 2

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.